New High-Voltage Transmission Line Proposed To Cross Jefferson County December, 2023 Tagged With: electric grid, First Energy, In Print Dec 2023, PJM Interconnection, solarPJM is proposing to construct a new 500 kV transmission line through Jefferson County by 2027. The new line would be built alongside the existing 500 kV line. Read the Full Story >>